"It will be interesting to know what they plan do with the stopped-up route, as it would be great if it was kept as a right of way or included in the open access land."
Yes, retaining it as a sort of tourist/viewing road was talked about but reference to that was mysteriously removed from the submitted papers.
Reply | with quote | Posted by nigelswift 13th November 2020ce 14:10 |
Stonehenge Tunnel Decision (tjj, Nov 12, 2020, 18:04)- Re: Stonehenge Tunnel Decision (thesweetcheat, Nov 13, 2020, 09:25)
- Re: Stonehenge Tunnel Decision (GLADMAN, Nov 15, 2020, 00:16)
- Re: Stonehenge Tunnel Decision (thelonious, Nov 16, 2020, 18:51)
- Re: Stonehenge Tunnel Decision (thesweetcheat, Nov 18, 2020, 08:53)
- Re: Stonehenge Tunnel Decision (nigelswift, Dec 01, 2020, 17:20)
- Re: Stonehenge Tunnel Decision (Howburn Digger, Dec 01, 2020, 18:49)
|
|