
In 1959 Stone 60 was straightened and, at the same time, in order to deal with what was seen as a weakness in its structure, the ‘cave’ in its
base was filled in. Here the wooden shuttering is constructed prior to pouring in the concrete.
In 1959 Stone 60 was straightened and, at the same time, in order to deal with what was seen as a weakness in its structure, the ‘cave’ in its
base was filled in. Here the wooden shuttering is constructed prior to pouring in the concrete.