Lots of detail of the damage caused by the farm track and ploughing at http://www.magic.gov.uk/rsm/34158.pdf which concludes with the telling sentence "The piles of logs, gamefeeders and fence situated on the monument are excluded from the scheduling, although the ground beneath them is included." Kind of makes you wonder what the value of scheduling is...
|
Posted by UncleRob
1st June 2008ce
|
|